ha. posted an offer on WHT with a un -metered/unlimited plan, but got my hand hit for doing so. was told i could offer un -metered/unlimited plans OR a metered plan on a site with un -metered/unlimited plan as well.
how interesting, i guess the assume that un -metered/unlimited plan cant and dont work...